Metrics was appointed to deliver the Stage 5 rainscreen cladding design for Ashley Road East, a landmark new-build residential development comprising two towers connected by a podium in central London. Our fully compliant solution brought together technical precision and architectural ambition to help realise the project’s complex and visually striking façade.
Across the two residential towers and connecting podium, our design scope encompassed the Sotech aluminium rainscreen panels, copings, brickwork, sub-grid and cavity barriers. We coordinated the SFS stud positions to accommodate the required sub-grid locations, while Metrics developed all interface detailing with the windows and curtain wall to ensure a fully integrated façade solution.
The geometric complexity of the aluminium rainscreen demanded an innovative and highly coordinated design approach. The sawtooth aluminium panels had to integrate seamlessly with feature banding and a bespoke coping engineered to accommodate abseil loads. To resolve these interfaces with precision, every panel was modelled in 3D using Inventor, creating a detailed virtual prototype of the building. The completed files were then issued directly to the fabricators for manufacture, streamlining the transition from design to production. Supported by a carefully sequenced installation strategy, the result is a truly distinctive façade that combines technical innovation with a bold architectural finish.